ZIRP Project [Completed]

Jose Cabrera NPP, currently under decommissioning.

Introduction

ZIRP Project was started in 2005 and was coordinated by Gas Natural Fenosa Engineering. The goal of this project is to recover several samples from the vessel internals of the Jose Cabrera NPP to test extracted materials at the laboratory the extracted materials and evaluate their properties, after having undergone a long period of irradiation in a commercial reactor.